Eindhoven Airport P1
Jonkman Coating has played an important role in the reconstruction of parking garage P1 at Eindhoven Airport.
OCT 2019
Eindhoven
Sheetmetal perforated
Powdercoating
Eindhoven Airport P1
Almost 900 days after the collapse of the parking garage at Eindhoven Airport, the completely rebuilt P1 was taken into use on 1 October. Jonkman Coating has provided all aluminum sheets, perforated with a special pattern, with a robust 2-layer powder coating system. The first layer of 60 micron epoxy primer and the second layer in the 2 colors yellow and white.
The plates are coated separately in the 2 colors and then mounted in such a way that, depending on the viewing angle, the oval building appears whiter or more yellow. A fantastic face.
Some images of “work in progress”. The actual coating of the plates at Jonkman Coating.